"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

POTENTIAL VALUE

CLOSEOUT

A process in which a 3D As-Built model is embedded with links to information such as serial codes, warranties, O&M Manual information, specifications and maintenance schedules/history of all the components in the building.

PROPOSAL

RECORD MODEL CLOSEOUT

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

  • Excellent tool for Facilities and Maintenance to access valuable project information with a few clicks versus digging through binders and paper documents.
  • Able to train staff on different equipment using model prior to project close-out.
  • Aid in future modeling and 3D design coordination for renovation.
  • Provide owner with accurate model of building, equipment, and spaces within a building to create possible synergies with other BIM Uses.

PRECONSTRUCTION

Cn3D Construction, a U.S. CAD company

CONSTRUCTION

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"