• Excellent tool for Facilities and Maintenance to access valuable project information with a few clicks versus digging through binders and paper documents.
  • Able to train staff on different equipment using model prior to project close-out.
  • Aid in future modeling and 3D design coordination for renovation.
  • Provide owner with accurate model of building, equipment, and spaces within a building to create possible synergies with other BIM Uses.

POTENTIAL VALUE

CLOSEOUT

CONSTRUCTION

PRECONSTRUCTION

A process in which a 3D As-Built model is embedded with links to information such as serial codes, warranties, O&M Manual information, specifications and maintenance schedules/history of all the components in the building.

PROPOSAL

RECORD MODEL CLOSEOUT

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

Cn3D Construction, a U.S. CAD company