"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

"BIM there, fixed that!"

  • Reduce and eliminate field conflicts prior to installation.
  • Reduces field RFI's and Change Orders significantly.
  • Visualize construction means and methods before placed in the field.
  • Increased productivity and less rework.
  • Prefabricate off-site leading to a safer and cleaner work environment.
  • More accurate as-built drawings for close-out.Overall decrease construction cost and time.

PRECONSTRUCTION

3D spatial coordination (mepf)

CLOSEOUT

PROPOSAL

"BIM there, fixed that!"

"BIM there, fixed that!"

Cn3D Construction, a U.S. CAD company

A process in which multiple models (design and construction) are joined together and clash detection software detects conflicts between the building systems.

"BIM there, fixed that!"

"BIM there, fixed that!"

CONSTRUCTION

"BIM there, fixed that!"

"BIM there, fixed that!"

POTENTIAL VALUE